Retrofit of PCS for LUKOIL-Western Siberia

Insist Avtomatika completed the 1st stage of works on retrofitting of the process control system of Preliminary water discharge facility No. 8 of oil and gas production department at the Vatyegan field (LUKOIL-Western Siberia). Engineers of Insist Avtomatika developed the application software for PCS and carried out start-up works.